Funding has now been identified and a preliminary schedule can be found on the New Bridge Design page. The design-build method will be used to design and construct the bridge, with the new bridge completed by November 2019.  Visit this page often to see "near live" construction and check out the latest photos, as well as updates in the newsletter.

Live Construction Camera

 

Bridge demolition picture 9/19/19
While demolition of the trusses are still a few weeks away, crews have begun dismantling the old bridge deck.


See Construction Photos from the Champ Clark Bridge HERE 

 

An example of what the rosemary colored, ledgestone patterned retaining wall will look like near the bluff on the south side of the new bridge.

Selected rosemary ledgestone